Construction of a small hydroelectric power plant (HPP) with an installed capacity of 0.3 MW at the Aktogan MK on the Keldy-Murat River complex in the Tarbagatai district of the East Kazakhstan region
Construction of a small hydroelectric power plant (HPP) with an installed capacity of 0.3 MW at the Aktogan MK on the Keldy-Murat River complex in the Tarbagatai district of the East Kazakhstan region
The project provides for the construction of a small hydroelectric power plant (HPP) with an installed capacity of 0.3 MW at the Kandysu River hydroelectric complex in the Tarbagatai district of the East Kazakhstan region. The maximum power generation capacity is 1 080 000 kWh.
- Indicator Results
- Investment amount, thousand US dollars 1 133
- NPV of the Project thousand, US dollars 460
- IRR, % 19
- EBITDA yield, %
- Payback period, years 14
- Discounted payback period, years - - 16